Sunday, November 25, 2007

Hawaii - Honokohau Harbor

We got a med-moor slip in the state harbor here and have started making arrangements for the boat repairs. We are to be hauled out on Dec 4 and moved to dry storage on the 21st. Then fly to Seattle the 25 thru the 16th. Then hopefully back in the water on the 16th.

We started removing the teak deck and installing the new toilet. Lots of work. Trinda is doing most of the teak. She has removed all of it from the starboard side, except for the fore and aft deck areas and is now cleaning up the remaining caulking.

We bought a Skipper Head, at $1150, guaranteed for the life of the boat. I sure hope it is. I should have it finished today.

No comments:

Post a Comment